Great Miami River Trail Bridge Replacement
Great Miami River Trail Bridge Replacement
Project Status
-
Proposed
Proposed
-
In Development
In Development
-
Pre-construction
Pre-construction
-
Construction
Construction
-
Completion
Completion
The City of Piqua will improve the Great Miami River Trail (GMRT) by constructing a new ADA(Americans with Disabilities Act) accessible bike/pedestrian bridge over the Great Miami River at Goodrich Giles Park and extending the GMRRT along the west side of the Great Miami River in the City of Piqua, Miami County. The extension will run along South Main Street (CR 25A) from the existing trail connection at the Piqua Utility Bridge to the new river crossing in the Park. The extension of the GMRRT will be a 10-foot wide paved trail. The river crossing will be a 12-foot wide two-span prefabricated steel truss with a reinforced concrete deck, piers, and abutments. The work includes the replacement of the existing sidewalk bridge over Leonard Ditch with a precast culvert.
View Project's Public Comments ()Icon
Public comments regarding our projects are always welcome!
Please let us know if you have questions, and thank you for your interest and input on the project!
Filter by Area of Interest
You can filter this list filtering with the topics on the list below.