Project Information
Pavement replacement and widening of U.S. 20 between SR 2 and SR 528 in the townships of Perry and Madison.
This project involves full replacement and widening of the roadway with asphalt pavement. The roadway will be widened from an existing width of 40’ to a proposed width of 50’. The pavement will be widened from four 10’ lanes to one 12’ and one 11’ lane with a 2’ shoulder in each direction.