Current and upcoming road closures and restrictions for Washington County are listed below. Click on each route to see its location at OHGO.com.
I-77 resurfacing - A resurfacing project is taking place on I-77 between Exits 1 and 6. The project also includes guardrail replacement, drainage correction, and concrete barrier upgrades. The passing lanes of I-77 north and south are closed. Estimated completion: June 4, 2021
I-77 resurfacing - A resurfacing and concrete joint repair project is taking place on I-77, between Exit 6 and Exit 16. The driving lane of I-77 north is closed. Estimated completion: August 1, 2021
SR 60 landslide - One lane of SR 60 is closed 1.5 miles south of Lowell due to a landslide. Temporary traffic signals and a 12 foot width restriction are in place. Estimated completion: August 1, 2021
SR 821 landslide - One lane of SR 821 is closed between Buells Run (TR 86) and Peaker Run (TR 327) due to a landslide. Temporary traffic signals and a 14 foot width restriction are in place. Estimated completion: July 1, 2021
SR 555 bridge replacement - A bridge replacement project is taking place on SR 555, between Barton Road (Township Road 714) and SR 676. One lane is closed. Temporary traffic signals and an 11 foot width restriction are in place. Estimated completion: November 1, 2021
City of Marietta signal/fiber optic upgrades - A traffic signal and fiber optic system project is taking place at various intersections in the City of Marietta, including Putnam, Front, Third, Seventh, Greene, Pike, and Acme Streets. Periodic short-term daily lane closures will be in place. Estimated completion: June 30, 2021
SR 339 bridge repair - A bridge repair project begins on June 1 on SR 339, between Main Street (County Road 102) and Beebe Road (Township Road 511). One lane will be closed, as well as the southern County Road 102 intersection. Temporary traffic signals and a 12 foot width restriction will be in place. Estimated completion: June 11, 2021
City of Marietta traffic signal/pedestrian safety improvements - A traffic signal and pedestrian safety improvement project begins on June 1 at various locations in the City of Marietta, including: Fifth St./Washington St., Fifth St/Garfield Ave., Fifth St./Wooster St., Sixth St./Warren St., Sixth St./Montgomery St., and North Seventh St. between Ephraim Cutler St. and Wooster St. There will be periodic daily lane closures in place. Estimated completion: September 1, 2021