Interstate 271 resurfacing – Resurface I-271 between Mayfield Rd. and I-90 in Highland Heights, Willoughby Hills and the Village of Mayfield.  Estimated Completion October 2021

  • I-271 between Mayfield Rd. and I-90 has various off-peak lane restrictions through October 2021.

 

Interstate 271 ramp re-alignment Replace and re-align the ramp from I-271 northbound to I-90 westbound and replace two bridges on I-271 between Eddy Rd. and I-90 in Willoughby Hills. Estimated Completion: September 2021


  • I-271 northbound and southbound (express lanes) between just south of Eddy Rd. and I-90 are shifted to the right.


U.S. Route 20 resurfacing –U.S. 20 between SR 528 and the Ashtabula County in Madison Township line is reduced to one lane of traffic in each direction on the existing westbound side via a bi-directional traffic pattern for resurfacing, through late October. Estimated Completion: late October 2021

 

State Route 2 bridge replacement - SR 2 over Worden Rd. in the city of Wickliffe has various lane restrictions for bridge replacement, through late October. Estimated Completion: late October 2021

 

State Route 44 paving and culvert repairs – SR 44 just north of I-90 in Concord Township has shoulder closures for culvert repairs and resurfacing through July. Estimated Completion: July 2021

 

Stevens Blvd. pavement replacement - Stevens Blvd. between SR 283 and SR 91 in the city of Eastlake has various lane restrictions for pavement replacement. Estimated Completion: late June 2021

 

State Route 84 resurfacing - SR 84 between SR 91 and Polo Park Dr. in the city of Willoughby is reduced to one lane in each direction through October 2021 for resurfacing. Estimated Completion: October 2021

 

State Route 283 (Lakeshore Blvd.) resurfacing –SR 283 (Lakeshore Blvd.) between Iroquois Trail and just west of Tamarack Blvd. in Willoughby has various daily lane restrictions maintained by for resurfacing through fall 2021. Estimated Completion: Fall 2021