I-75 Thru the Valley

Project Status

  1. Proposed

  2. In Development

  3. Pre-construction

  4. Construction

  5. Completion

The I-75 Thru the Valley project involves the widening and reconstruction of I-75 from SR 126/Ronald Reagan Cross County Highway to just south of I-275 in Cincinnati. The goals of this project are to improve safety and ease congestion on I-75, increase regional mobility, and provide transportation solutions that are compatible with local land use plans.

Project Phases

Phases 1 and 2: I-75 Widening between Shepherd Lane and Glendale-Milford Road

UNDER CONSTRUCTION NOW  •  SUMMER 2017 – SPRING 2021 •  $90 MILLION  •  PID 82288

Reconstruct I-75 from Shepherd Lane to Glendale-Milford Road, adding a fourth lane in each direction. The project also includes reconstruction of the Shepherd Lane interchange and the reconstruction and realignment of Neumann Way.

MORE INFORMATION

Phase 3: I-75 Widening between Mill Creek and SR 126

FALL 2023 – SUMMER 2025  •  $39-49 MILLION*  •  PID 88124

Reconstruct I-75 between bridge over the Mill Creek and SR 126 (Ronald Reagan Highway), adding a fourth lane in each direction.

Phase 4: Railroad Bridge Replacement

FALL 2022 – FALL 2024  •  $22-32 MILLION  •  PID 88129*

Replace the Norfolk Southern Railroad bridge and realign the exit ramp to Galbraith Road.

*Further development of this project is on hold pending completion of the Alternative Evaluation Report that is under way.

Phase 5: I-75 SB Widening between Shepherd Lane and Galbraith Road

SPRING 2024 – SPRING 2025  •  $63-73 MILLION  •  PID 88132*

Reconstruct southbound I-75 from Shepherd Lane to Galbraith Road, adding a fourth lane. Construct a collector-distributor road to provide ramps to and from Anthony Wayne Avenue and Galbraith Road.

*Further development of this project is on hold pending completion of the Alternative Evaluation Report that is under way.

Phase 6: I-75 NB Widening between Shepherd Lane and Galbraith Road

SPRING 2027 – SPRING 2030  •  $125-135 MILLION  •  PID 88133*

Reconstruct northbound I-75 from Galbraith Road to Shepherd Lane, adding a fourth lane. Construct a ramp from westbound state Route 126 (Ronald Reagan Highway) to northbound I-75

*Further development of this project is on hold pending completion of the Alternative Evaluation Report that is under way.

Phase 7

This phase no longer exists, as its work has been absorbed into other phases.

Phase 8: I-75 Widening between Glendale-Milford Road and Kemper Road

SPRING 2021 – SUMMER 2025  •  $46 MILLION  •  PID 76256

Reconstruct I-75 from Glendale-​Milford Road to the Kemper Road overpass, adding a fourth lane in each direction and adding capacity at the Sharon Road interchange and at Sharon Road and Chester Road.

MORE INFORMATION

Phasing Map

Map

Thru the Valley phasing map

Alternate Feasibility Study

Phases 4, 5, and 6: Alternate Feasibility Study

PID 113687

This feasibility study, currently underway, will include:

  • Potential impacts to private property, public parks, historic districts/sites, streams and wetlands, habitat, landfills/other regulated sites
  • Data collection (field surveying, soil borings, ecological survey, etc.)
  • Engineering drawings to better understand right-of-way purchases and utility relocations
  • New cost estimates
  • Study will be used to compare new Alternative 1 to the original previously planned alignment

Results of this study, along with public input, will determine how to move forward with I-75 Thru the Valley Phases 4, 5, and 6 outlined above.

STUDY REPORTS AND FILES

View Project's Public Comments ()

Leave a Comment