SR 32/Brooks Malott Road interchange construction

Bridge Expansion

Project Status

  1. Proposed

  2. In Development

  3. Pre-construction

  4. Construction

  5. Completion

About the project

The proposed project will construct a full interchange between the existing intersections of State Route 32 and Brooks-Malott Road, and State Route 32 and Bodman Road. Both existing at-grad intersections will be removed, along with the traffic signal at S.R. 32 and Brooks-Malott Road. A single right-out access will be maintained from Brooks-Malott south onto S.R. 32 Eastbound for emergency vehicles only. New local roads will connect the interchange to the existing local transportation system. The goal of the new interchange is to increase safety by eliminating the at-grade intersections, as well as improve traffic flow along S.R. 32. 

View Project's Public Comments ()

Public comments regarding our projects are always welcome!

This section is for frequently asked questions and project-related questions. You may notice that some projects require one or more formal comment period(s) with deadlines for comments to be considered during certain phase(s) of the project development process. Typically called the “public comment period," this is when ODOT asks the public for input before an important decision needs to be made, such as choosing a preferred alternative. You may notice these periods generally occur immediately following a public meeting.

All comments received, regardless of when or how they are submitted, will be reviewed and considered and/or responded to by the ODOT project team. Comments received through this forum will, when appropriate, be publicly posted along with ODOT’s response; Such comments will be moderated to remove personal information prior to posting.

Please let us know if you have questions, and thank you for your interest and input on the project! 